Project Examples

Inspection Programs for Piping Systems


Flange face leak
Caused by erosion/corrosion due to operating the control valve at 25% open without an MOC in place.

 

Inspection Programs for Piping Systems: CVI/UT/LRUT/RT for small bore

Corrosion under supports often overlooked in inspection campaigns

Inspection Programs for Piping Systems: CVI/UT/LRUT/RT for small bore

Corrosion under supports often overlooked in inspection campaigns

Erosion, but still fit for purpose

CUI risk assessment
At an attachment to the shell of a separator to access platform  forming a temperature gradient and leak path through the insulation and consequential  severe corrosion